激情综合五月开心婷婷-97av视频-a在线视频-久久人人爽人人人澡A片-少妇搡BBBB搡-国产不卡一卡2卡三卡4卡5卡-秘密熟母俱乐部短篇小说-欧美日韩中文国产一区

您好,歡迎訪問(wèn)山東燊赫通風(fēng)設(shè)備有限公司網(wǎng)站!

服務(wù)熱線

13210558111

風(fēng)管系統(tǒng)漏風(fēng)量測(cè)試方法

來(lái)源:http://m.shyrzs.com/     發(fā)布時(shí)間:2021-08-17  

1、漏風(fēng)量測(cè)試裝置應(yīng)采用經(jīng)檢驗(yàn)合格的專用測(cè)量?jī)x器,或采用符合現(xiàn)行標(biāo)準(zhǔn)《用安裝在圓形截面管道中的差壓裝置測(cè)量滿管流體流量》GB2624規(guī)定的計(jì)量元件組成的測(cè)量裝置。
1. The air leakage test device shall be a qualified special measuring instrument or a measuring device composed of measuring elements in accordance with the current national standard measuring full pipe fluid flow with differential pressure device installed in circular section pipeline (gb2624).
2、正壓或負(fù)壓風(fēng)管系統(tǒng)與設(shè)備的漏風(fēng)量測(cè)試,分正壓試驗(yàn)和負(fù)壓試驗(yàn)兩類,可采用正壓試驗(yàn)的測(cè)試來(lái)檢驗(yàn)。
2. The air leakage test of positive pressure or negative pressure air duct system and equipment is divided into positive pressure test and negative pressure test, which can be tested by positive pressure test.
3、風(fēng)管系統(tǒng)漏風(fēng)量測(cè)試可整體或分段進(jìn)行。
3. The air leakage test of air duct system can be carried out as a whole or in sections.
山東通風(fēng)管道加工
4、風(fēng)管系統(tǒng)漏風(fēng)量測(cè)試應(yīng)按下列步驟進(jìn)行:
4. The air leakage test of air duct system shall be carried out according to the following steps:
①測(cè)試前,被測(cè)風(fēng)管系統(tǒng)的所有開(kāi)口處均應(yīng)嚴(yán)密封閉,不得漏風(fēng)。
① Before the test, all openings of the tested air duct system shall be tightly closed without air leakage.
②將專用的漏風(fēng)量測(cè)試裝置用軟管與被測(cè)風(fēng)管系統(tǒng)連接。
② Connect the special air leakage test device with the measured air duct system with a hose.
③開(kāi)啟漏風(fēng)量測(cè)試裝置的電源,調(diào)節(jié)變頻器的頻率,使風(fēng)管系統(tǒng)內(nèi)的靜壓達(dá)到設(shè)定值后,測(cè)出漏風(fēng)量測(cè)試裝置上 流量節(jié)流器的壓差值△P。
③ Turn on the power supply of the air leakage test device, adjust the frequency of the frequency converter to make the static pressure in the air duct system reach the set value, and then measure the pressure difference △ P of the flow restrictor on the air leakage test device.
④測(cè)出流量節(jié)流器的壓差值△P后,按公式Q=f(△P)(m³/h)計(jì)算出流量值,該流量值Q(m³/h)再除以被測(cè)風(fēng)管系統(tǒng)的展開(kāi)面積F(㎡),即為被測(cè)風(fēng)管系統(tǒng)在實(shí)驗(yàn)壓力下的漏風(fēng)量QA[m³/(h·㎡)]。
④ After measuring the pressure difference △ P of the flow restrictor, press the formula q = f (△ P) (M ³/ h) Calculate the flow value, which is Q (M ³/ h) Divided by the developed area f (㎡) of the tested air duct system, it is the air leakage QA [M] of the tested air duct system under the experimental pressure ³/( h·㎡)]。
5、當(dāng)被測(cè)風(fēng)管系統(tǒng)的漏風(fēng)量QA[m³/(h·㎡)]超過(guò)設(shè)計(jì)或本規(guī)程的規(guī)定時(shí),應(yīng)查出漏風(fēng)部位(可用聽(tīng)、摸、觀察、肥皂水或煙氣檢漏),做好標(biāo)記;并在修補(bǔ)后重新測(cè)試,直合格。
5. When the air leakage of the measured air duct system is qa[m ³/( H · ㎡)] when it exceeds the provisions of the design or this specification, find out the air leakage part (listen, touch, observe, soapy water or smoke leak detection) and mark it; And retest after repair until qualified.
6、風(fēng)管漏風(fēng)量測(cè)試用測(cè)量工具或檢測(cè)儀器應(yīng)符合表6的規(guī)定。
6. Measuring tools or instruments for air leakage test of air duct shall comply with the provisions of table 6.

上一篇:通風(fēng)管道在車間的降溫工程作用很重要
下一篇:排煙系統(tǒng)通風(fēng)管道布局的一般標(biāo)準(zhǔn)

婷婷天堂综合| 99久久激情视频| 五月婷婷丁香av| 五月丁香六月婷婷综合| 久久五月丁香| 五月婷婷激情综合网 | 乱子伦牲交小说口述| 狠狠干综合| 新激情五月天天在线网| 五月花免费视频| 国产3p露脸普通话对白| 天美传媒免费观看MV天美网| 开心四房| 最近中文字幕完整版2018免费| 小蝌蚪app最新版下载汅api免费 | 亚洲欧美性爱一区二区三区| 香蕉久久国产AV一区二区 | 九九机热| 殴美综合激情五月天免费视频| 丰满大码的熟女在线观看| 亚洲精品鲁一鲁一区二区三区| 开心色播五月| 精品国产乱码久久久久久夜深人妻 | 囸逼视频91下载| 性爱五月婷| 丁香五月婷婷色偷偷| 丁香五月AV| 婷婷在线免费| 96人人操人人操人人| 五月色导航|